News

Cambridge Residents Slam Council Proposal to Delay Bike Lane Construction

News

‘Gender-Affirming Slay Fest’: Harvard College QSA Hosts Annual Queer Prom

News

‘Not Being Nerds’: Harvard Students Dance to Tinashe at Yardfest

News

Wrongful Death Trial Against CAMHS Employee Over 2015 Student Suicide To Begin Tuesday

News

Cornel West, Harvard Affiliates Call for University to Divest from ‘Israeli Apartheid’ at Rally

Changes in the Carey Building.

NO WRITER ATTRIBUTED

At the end of this year the Carey Building will pass into the hands of the Department of Mining. The building will be altered during the summer. The present cage will be fitted up for a metallurgical laboratory. What is now the hand-ball room will be made into a lecture room on the ground floor and a drafting room will be built above it. The dressing rooms down stairs are to be used as store-rooms.

The large locker room in the second story will be altered for a library and a laboratory of Economic Geology will be located on this floor. The tank will remain as it is for the present, but will be floored over eventually for a chemical laboratory.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags