News

Cambridge Residents Slam Council Proposal to Delay Bike Lane Construction

News

‘Gender-Affirming Slay Fest’: Harvard College QSA Hosts Annual Queer Prom

News

‘Not Being Nerds’: Harvard Students Dance to Tinashe at Yardfest

News

Wrongful Death Trial Against CAMHS Employee Over 2015 Student Suicide To Begin Tuesday

News

Cornel West, Harvard Affiliates Call for University to Divest from ‘Israeli Apartheid’ at Rally

Soldiers Field Speedway.

NO WRITER ATTRIBUTED

Work has been started on the speedway and river drive across the Soldiers Field marshes. A railroad has been laid to be used in the operations and three dredging machines are now removing the material from the Charles, with which the dike and drives are to be built. A gang of men is putting down a system of piping to drain the marshes back of the dike.

The driveway is to be about 160 feet wide in all, with two separate drives, four sidewalks and a bicycle path. It will follow the river bank to a point opposite Longfellow Park, thence the speedway proper will extend straight to the abattoir, at the southwest corner of the field, a distance of about a mile. Enough ground will be allowed between the driveway and the river, just above the Boylston street bridge, for the proposed University boat house. It is not thought that these improvements on Soldiers Field will be entirely completed within two years.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags