News
‘Deal with the Devil’: Harvard Medical School Faculty Grapple with Increased Industry Research Funding
News
As Dean Long’s Departure Looms, Harvard President Garber To Appoint Interim HGSE Dean
News
Harvard Students Rally in Solidarity with Pro-Palestine MIT Encampment Amid National Campus Turmoil
News
Attorneys Present Closing Arguments in Wrongful Death Trial Against CAMHS Employee
News
Harvard President Garber Declines To Rule Out Police Response To Campus Protests
Concrete piers are at present being put in between Kirkland House and the Master's Lodgings in preparation for a brick wall such as exists between the two units of Winthrop House. A gate will be installed to permit passage to the dining hall. The wall will be topped by an iron spiked fence.
Surveying of the Eliot House campus is now being carried on to prepare for the planting of shrubbery and a number of trees. It is expected that a flower bed will be laid alongside the brick terrace.
Want to keep up with breaking news? Subscribe to our email newsletter.