News

Cambridge Residents Slam Council Proposal to Delay Bike Lane Construction

News

‘Gender-Affirming Slay Fest’: Harvard College QSA Hosts Annual Queer Prom

News

‘Not Being Nerds’: Harvard Students Dance to Tinashe at Yardfest

News

Wrongful Death Trial Against CAMHS Employee Over 2015 Student Suicide To Begin Tuesday

News

Cornel West, Harvard Affiliates Call for University to Divest from ‘Israeli Apartheid’ at Rally

New Bridge Expected by Autumn

NO WRITER ATTRIBUTED

The Cambridge Bridge Commission, composed of the mayors of Cambridge and Boston, and Mr. E. D. Leavitt of Cambridge, has authorized the drafting of plans for the construction of a bridge to replace the present one on Boylston street, near Soldiers Field, which connects Cambridge with Brighton. The new bridge will be a temporary structure, however, below the site of the permanent bridge, which will probably be built shortly. The object of the new bridge is to afford a traffic way during the building of the permanent bridge in the place of the present inadequate structure.

The temporary bridge will be made of wood, at an estimated cost of about $30,000. It will be sixty feet wide, and will have a wooden leaf draw similar to the one in the present bridge. It is expected that the new bridge will be completed before the beginning of the fall College term.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags