News

‘Deal with the Devil’: Harvard Medical School Faculty Grapple with Increased Industry Research Funding

News

As Dean Long’s Departure Looms, Harvard President Garber To Appoint Interim HGSE Dean

News

Harvard Students Rally in Solidarity with Pro-Palestine MIT Encampment Amid National Campus Turmoil

News

Attorneys Present Closing Arguments in Wrongful Death Trial Against CAMHS Employee

News

Harvard President Garber Declines To Rule Out Police Response To Campus Protests

Workmen to Stay at Mt. Auburn Diggings

NO WRITER ATTRIBUTED

Workmen will continue excavating along Mt. Auburn St, for an indefinite period, a spokesman for the Cambridge Gas and Electric Company said last night.

So far, 13 holes have been dug between Linden and Holyoke Streets, most of them in front of Claverly Hall. The workmen are tightening joints on a 24 inch gas pipe, which sprung a leak several weeks ago and began to disturb residents of Claverly. A minute trickle of gas was escaping from the feed line into the basement of the dormitory through a conduit.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags