News

Pro-Palestine Encampment Represents First Major Test for Harvard President Alan Garber

News

Israeli PM Benjamin Netanyahu Condemns Antisemitism at U.S. Colleges Amid Encampment at Harvard

News

‘A Joke’: Nikole Hannah-Jones Says Harvard Should Spend More on Legacy of Slavery Initiative

News

Massachusetts ACLU Demands Harvard Reinstate PSC in Letter

News

LIVE UPDATES: Pro-Palestine Protesters Begin Encampment in Harvard Yard

Changes in the Carey Building.

NO WRITER ATTRIBUTED

At the end of this year the Carey Building will pass into the hands of the Department of Mining. The building will be altered during the summer. The present cage will be fitted up for a metallurgical laboratory. What is now the hand-ball room will be made into a lecture room on the ground floor and a drafting room will be built above it. The dressing rooms down stairs are to be used as store-rooms.

The large locker room in the second story will be altered for a library and a laboratory of Economic Geology will be located on this floor. The tank will remain as it is for the present, but will be floored over eventually for a chemical laboratory.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags